Commercial Solar

Engineered systems sized to your operation.

Commercial solar pays back hardest when it is sized for your actual load profile — not a salesperson's rule of thumb. We design from your interval data.

Typical timeline
4 – 12 weeks
System sizes
30 kW – multi-MW
Engineering
Structural + electrical
Service area
SEQ & N. NSW
Overview

We size commercial arrays from your half-hourly interval data and tariff structure, not from roof area alone. The result is a system that matches your daytime consumption and gives you a predictable return.

Our work covers single-tenancy warehouses, retail premises, body corporates and multi-site portfolios. We handle structural assessment, network application, install and ongoing maintenance.

Scope

What's included.

  • 01
    Interval-data analysis and financial modelling
  • 02
    Structural and electrical engineering reports
  • 03
    DNSP application and grid connection
  • 04
    Commercial-grade mounting and string design
  • 05
    Three-phase inverter and switchboard works
  • 06
    Monitoring, reporting and maintenance plan
Process

How we run this work.

Clear steps, agreed upfront. No surprises mid-job.

  1. 01

    Discovery

    We collect interval data and conduct a site walkthrough.

  2. 02

    Engineered design

    Structural report, single-line diagram and financial model.

  3. 03

    Approvals

    Network application, lender or landlord paperwork, and council where required.

  4. 04

    Installation

    Staged install to minimise disruption to operations.

  5. 05

    Commissioning

    Performance testing, monitoring setup and handover documentation.

They sized the array against our interval data instead of guessing from the roof. The payback model has held up.
M. Reynolds · Operations Manager, Eagle Farm
FAQ

Common questions

Get in touch

Planning a project? Talk to a licensed contractor.

Quotes are free, considered, and based on a real site review — not a sales script.